We have been doing business in the building trade for most of our lives. We have always tried to make energy efficient homes with high efficient insulation, light bulbs, appliances and any other building materials. We realized that even with all the efforts there is a substantial amount of electric is still being used. So we moved our efforts to solar installation and that along with our other efforts truly makes a difference.
A building permit is required to perform works which involve the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or bearing support, or the removal or change of any required means of egress, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas soil, waste, vent or similar piping, electric wiring or mechanical or other work affecting public health or general safety
Boiler, building, electrical, elevator, mechanical, and plumbing permits can be obtained or checked expeditiously online at: https://aca3.accela.com/lara/ or via mail or in-person at our office in Lansing.