I started this company because I saw a need in the industry. Nearly every company I have ever worked for only had one thing in mind. Their wallets. No concerns for quality, No care for the customer, and a taillight warranty to boot! Just get it done and get out of there. I could not stand it any longer, and so I decided to go out on my own, and make a difference!
A building permit is required to perform works which involve the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or bearing support, or the removal or change of any required means of egress, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas soil, waste, vent or similar piping, electric wiring or mechanical or other work affecting public health or general safety
Boiler, building, electrical, elevator, mechanical, and plumbing permits can be obtained or checked expeditiously online at: https://aca3.accela.com/lara/ or via mail or in-person at our office in Lansing.