Specialized lawn care started in 2005 with one push mower and the determination to succeed. Over the past 11 year a lot has changed for us. The biggest was making the comitment to becoming a Eco-friendly company. We are currently running our mowers on propane (fuel) and have implemented Stihl's Lithium-ion battery power hand equipment. This keeps us operating much quieter then the competition around the job site.
A building permit is required to perform works which involve the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or bearing support, or the removal or change of any required means of egress, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas soil, waste, vent or similar piping, electric wiring or mechanical or other work affecting public health or general safety
Boiler, building, electrical, elevator, mechanical, and plumbing permits can be obtained or checked expeditiously online at: https://aca3.accela.com/lara/ or via mail or in-person at our office in Lansing.