Deciding to take the leap and manage my own business was a huge leap of faith in 2008. I never regretted that decision and the Hope that God will sustain me in something I love and want to do, make customers happy with there decision, and improvement in choosing me as there go to guy.
A building permit is required to perform works which involve the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or bearing support, or the removal or change of any required means of egress, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas soil, waste, vent or similar piping, electric wiring or mechanical or other work affecting public health or general safety
Boiler, building, electrical, elevator, mechanical, and plumbing permits can be obtained or checked expeditiously online at: https://aca3.accela.com/lara/ or via mail or in-person at our office in Lansing.